PIS Error | Code: 6056 #90

Closed
opened 2024-11-11 10:21:50 +00:00 by owlbot · 1 comment
Collaborator

PIS Code 6056.
Diagram dated 2024-11-11 00:00:00 has been parsed and produced a mismatch with the OwlBoard database.

Diagram Stops: CDF,NWP,STJ,PWY,FIT,BRI,NLS,YAT,WOR,WSM,HIG,BWT,TAU,TVP,EXD,DWL,TGM,NTA,TOT,IVY,PLY,STS,SGM,LSK,BOD,LOS,PAR,SAU,TRU,RED,CBN,HYL,SER,PNZ

Database Stops: PNZ,SER,HYL,CBN,RED,TRU,SAU,PAR,LOS,BOD,LSK,MEN,SGM,STS,SBF,KEY,DOC,DPT,PLY,IVY,TOT,NTA,TGM,DWL,EXD,TVP,TAU,BWT,HIG,WSM,YAT,BRI

The train which was identified in the database is:
stpIndicator: P
operator: GW
trainUID: G45089
scheduleStart: 2024-06-02T23:00:00.000Z
scheduleEnd: 2024-12-13T23:59:59.000Z
daysRun: m,t,w,th,f

This requires a manual check of the PIS file to identify mistakes or changes.
Make sure that you validate that the service runs on the correct day.
If the stpIndicator is 'O' or 'N', it is possible that the train schedule is newer than the parsed diagram.

PIS Code 6056. Diagram dated 2024-11-11 00:00:00 has been parsed and produced a mismatch with the OwlBoard database. Diagram Stops: CDF,NWP,STJ,PWY,FIT,BRI,NLS,YAT,WOR,WSM,HIG,BWT,TAU,TVP,EXD,DWL,TGM,NTA,TOT,IVY,PLY,STS,SGM,LSK,BOD,LOS,PAR,SAU,TRU,RED,CBN,HYL,SER,PNZ Database Stops: PNZ,SER,HYL,CBN,RED,TRU,SAU,PAR,LOS,BOD,LSK,MEN,SGM,STS,SBF,KEY,DOC,DPT,PLY,IVY,TOT,NTA,TGM,DWL,EXD,TVP,TAU,BWT,HIG,WSM,YAT,BRI The train which was identified in the database is: stpIndicator: P operator: GW trainUID: G45089 scheduleStart: 2024-06-02T23:00:00.000Z scheduleEnd: 2024-12-13T23:59:59.000Z daysRun: m,t,w,th,f This requires a manual check of the PIS file to identify mistakes or changes. Make sure that you validate that the service runs on the correct day. If the stpIndicator is 'O' or 'N', it is possible that the train schedule is newer than the parsed diagram.
owlbot added the
bug
pis
labels 2024-11-11 10:21:50 +00:00
fred.boniface was assigned by owlbot 2024-11-11 10:21:50 +00:00
fred.boniface added the
trainfx check
label 2024-11-11 10:33:20 +00:00

Database correct

Database correct
Sign in to join this conversation.
No Milestone
No Assignees
2 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: OwlBoard/data#90
No description provided.